Design and Construct Contract - Kings Canyon Power Station - Refurbishment of Kings Canyon Solar Farm

Status: Current Region: Central Australia (NT) Posted by: Gia Punhalban
Overview
Territory Generation is refurbishing the existing 225kW solar farm up to a new capacity of 700kW by using the existing panel structures, installation and connecting a 900kVA Battery Energy Storage System, and carrying out modifications to the existing LV switchboard.